LOCATION
Darwin, NT
CLIENTS
Kawasaki Heavy Industries Laing O’Rourke JV, BGC
VALUE
$29M
PROJECT DATES
September 2013 to March 2017
Whittens delivered various scopes of work for clients for the Ichthys LNG Project, including:
LNG Civils 2: Provision of resources for the construction of in-situ concrete works and other civil and underground services as required to facilitate construction of site perimeter concrete drainage, sedimentation and settlement structures.
LNG Civils 3: Provision of resources for the construction of in-situ concrete works and other civil and underground services as required including foundations, backfilling, and, process area heavy and light duty concrete pavements
LNG Civils 7: Scope of work included providing resources for the construction of in-situ concrete works and other civil and underground services to a succinct SP1 and SP2 scope of civil work package during Darwin’s wet season, managing resources and logistics accordingly. These activities included critical path works for identified foundations and heavy and light duty concrete pavements.
Product Off-Loading Jetty: Provision of labour resources to facilitate erection and installation of formwork, steel reinforcement fixing and concrete placement and finishing to the jetty structure including all insitu concrete works.
Material Off Loading Jetty: Scope of work included the labour resources required to facilitate erection and installation of formwork, steel reinforcement fixing and concrete placement and finishing to the jetty structure including all insitu concrete works.