Eastern Ridge Services

LOCATION
Newman, WA

CLIENT
BHP

VALUE
$3M

COMPLETION DATE
June 2020

VOLUME

Supply and installation of HV standpipes for Eastern Ridge to improve water supply to BHP’s Mining operations at OB24 and OB25. Scope of works included:

  • 500kL raw water tank with piping, valves, solar control with telemetry and PLC integration.
  • Solenoid control valves, 2 x HV pump and standpipe.
  • 3 km of DN315 HDPE piping with steel piping manifolds.
  • Full package execution including civil, structural, mechanical, electrical and piping.