LOCATION
Newman, WA
CLIENT
BHP
VALUE
$3M
COMPLETION DATE
June 2020
VOLUME
Supply and installation of HV standpipes for Eastern Ridge to improve water supply to BHP’s Mining operations at OB24 and OB25. Scope of works included:
- 500kL raw water tank with piping, valves, solar control with telemetry and PLC integration.
- Solenoid control valves, 2 x HV pump and standpipe.
- 3 km of DN315 HDPE piping with steel piping manifolds.
- Full package execution including civil, structural, mechanical, electrical and piping.